A heavy-duty blue industrial truck trailer with cooling equipment and large hoses connected to a brick factory building.
A heavy-duty blue industrial truck trailer with cooling equipment and large hoses connected to a brick factory building.

Self-Contained Fleet

Air-cooled temporary chillers up to 500 tons

Rapid outdoor deployment units featuring integral pumps and simplified camlock connections, eliminating cooling tower water source requirements.

An electrical engineer in a yellow hard hat and safety vest operates control panels on industrial HVAC equipment.
An electrical engineer in a yellow hard hat and safety vest operates control panels on industrial HVAC equipment.
Industrial steel pipelines with yellow manual control valves at a chemical processing plant or oil refinery facility.
Industrial steel pipelines with yellow manual control valves at a chemical processing plant or oil refinery facility.

Site Advantages

Engineered for rapid outdoor tie-in

Zero Water

Eliminate tower water requirements

Air-cooled package designs reject heat directly to ambient air, bypassing the need for permanent cooling tower infrastructure or chemical treatment loops.

Fast Hookups

Simplified electrical and fluid tie-ins

Equipped with quick-connect camlock power inputs and standard flanged water connections to slash installation time during emergency responses.

Need air-cooled tonnage on site?

Speak directly with our engineering team for immediate sizing, availability, and 24/7 dispatch across the United States.